Articles tagged with Pekatahi Bridge
NZTA Awards Beca Design Contract for New Two-Lane SH2 Pekatahi Bridge
3 weeks ago | 243 viewsTransport Minister Chris Bishop announced that NZTA has awarded a design contract to Beca for a new two-lane replacement of the one-lane SH2 Pekatahi Bridge, aiming to improve safety, resilience, and reliability. The new 325-meter bridge will feature earthquake-resilient foundations, an elevated deck to withstand flooding, and be constructed alongside the existing bridge to avoid long-term closures, with construction expected to start by mid-2027 pending funding approval. Meanwhile, NZTA will continue maintaining the current bridge, which remains safe but prioritized for replacement due to resilience concerns, with costs estimated between $64 and $69 million and construction lasting 18-24 months.
Tags: Chris Bishop NZ Transport Agency Beca State Highway 2 Pekatahi Bridge Eastern Bay of Plenty SH2 National Land Transport Programme TairāwhitiSH36 Culvert Replacement Begins This Month Between Tauranga and Rotorua
3 months ago | 655 viewsTransport Minister Chris Bishop announced that replacement of the aging SH36 Hauraki Stream Culvert between Tauranga and Rotorua will begin this month, with completion expected by early 2027. The $10-12 million project, led by Isaac Construction Ltd, uses prefabricated components to deliver a wider, stronger bridge as part of the 2024-27 National Land Transport Programme (NLTP), which prioritizes upgrading nine bridges and culverts, with five more recently added. This initiative reflects the government's focus on maintaining critical state highway infrastructure to support freight, tourism, and community connectivity across New Zealand.
Tags: Chris Bishop NZ Transport Agency Isaac Construction Ltd State Highway 36 Tauranga Rotorua National Land Transport Programme Hauraki Stream Bridge Mangapepeke Culvert Pekatahi BridgeNew Two-Lane Pekatahi Bridge Planned for SH2 in Eastern Bay of Plenty
7 months ago | 912 viewsTransport Minister Chris Bishop announced the construction of a new two-lane bridge on SH2 near Tāneatua to replace the inadequate one-lane Pekatahi Bridge, with design and consenting funded at $5 million and construction expected to start in mid-2027 at a total cost of $64-69 million. The new bridge will be built adjacent to the existing one to minimize disruption, feature earthquake-resilient foundations, flood protection, and accommodate High Productivity Motor Vehicles, thereby supporting regional economic growth and improving freight reliability. Meanwhile, NZTA will maintain the current bridge with steel plate installations and ongoing monitoring until the new bridge is completed, addressing safety and community concerns in the interim.
Tags: Chris Bishop Dana Kirkpatrick NZ Transport Agency Pekatahi Bridge State Highway 2 Tāneatua Eastern Bay of Plenty Tairāwhiti Bay of Plenty Port of Tauranga