Articles tagged with Transport Infrastructure
NZTA Funds $2.7M Whanganui Wakefield Street Railway Overbridge Replacement
1 month ago | 253 viewsThe NZ Transport Agency has approved $2.7 million funding for a new Wakefield Street railway overbridge in Whanganui East to replace the unsafe 70-year-old timber bridge closed in January 2025. The new bridge, funded 62% by NZTA and the remainder by Whanganui District Council, will restore a vital local connection, support heavier vehicles, and improve transport resilience. Construction is set to begin later this year and finish by mid-2027, enhancing safety and efficiency for residents and businesses.
Tags: Chris Bishop Carl Bates NZ Transport Agency Whanganui East Wakefield Street bridge New Plymouth–Marton rail line Whanganui District Council railway overbridge transport infrastructure New ZealandFast-Track Approval Granted for Takitimu North Link Stage 2 in Bay of Plenty
2 months ago | 377 viewsThe Takitimu North Link – Stage 2, a 7.7-kilometre four-lane highway between Te Puna and Ōmokoroa in the Western Bay of Plenty, has received Fast-track approval, aiming to improve safety, reliability, and regional growth. This project is part of the Government’s broader infrastructure plan to address New Zealand’s infrastructure deficit, create jobs, and stimulate economic output, with the Takitimu North Link expected to generate around $610 million and over 4,800 jobs. It is the 14th project approved through the Fast-track process, which expedites infrastructure development across various sectors nationwide.
Tags: Chris Bishop NZTA Takitimu North Link Bay of Plenty Infrastructure Minister New Zealand Government Te Puna Ōmokoroa Transport infrastructureTemporary Steel Bridge to Reopen State Highway 39 by Mid-March After Floods
3 months ago | 779 viewsA temporary 40-meter steel-framed bridge with a 50-tonne weight limit is planned to be operational by mid-March to restore access south of Pirongia after the Mangati Bridge was destroyed in floods. Crews have cleared debris and begun work on both the temporary and permanent bridge, with the permanent two-lane bridge construction set to start later this year. The project has strong support from council partners and landowners, prioritizing safe and rapid reconnection of the community.
Tags: Mangati Bridge State Highway 39 temporary bridge Chris Bishop NZ Transport Agency Pirongia Acrow bridge flood damage bridge reconstruction transport infrastructure